AISC Certified Steel Erectorwith Seismic Endorsement
Complete documentation portal for quality management, certification compliance, and audit preparation. All documents maintained per AISC 207-25 standards.
⚠️ URGENT: ACTION REQUIRED
48 Information Items Missing
14 documents need information before AISC submission
⚠️ 14 Documents Need Information
Click "Add Info" to open document and complete required fields
AISC Certified Steel Erector Quality Manual
- ▶Final review and approval signatures from Nate Swink (President) and Eddie Medina (Management Representative)
- ▶Verify all references are to FIELD ERECTION operations only (no shop fabrication)
- ▶Update document control section with current revision date
- +1 more items...
Organizational Chart - AISC CSE
- ▶CRITICAL: Remove all shop operations/fabrication references - CSE certification is FIELD ERECTION ONLY (shop foreman, fabricators, shop QC, AESS-4 specialists are NOT part of CSE scope)
- ▶Eduardo Medina title must explicitly show "Management Representative for Quality" per AISC 207-25 requirement
- ▶Ernesto Diaz title must show "Field QA Manager / Lead Field QC Inspector (AWS CWI)" emphasizing FIELD operations
- +5 more items...
Quality Policy - AISC CSE
- ▶Final signature from Nate Swink for official policy statement
Personnel Qualification Documentation Package
- ▶Ernesto Diaz AWS CWI certificate number
- ▶Years with company for all field personnel
- ▶Years in steel erection industry for all field personnel
- +1 more items...
FIELD Equipment List and Calibration Records
- ▶Complete FIELD equipment inventory with serial numbers (cranes, rigging, field welding)
- ▶Current calibration certificates with due dates for field measuring equipment
- ▶NIST traceability documentation for field inspection tools
- +1 more items...
FIELD Quality Forms Package (F-001 through F-012)
- ▶Complete approval matrix signatures from all signatories (Eddie Medina, Ernesto Diaz, Mike Dunkleberger, Nate Swink)
- ▶Verify all forms reference FIELD operations only (no shop forms included)
Seismic Endorsement Documentation Package - FIELD ERECTION
- ▶Project dates and tonnage for SWI-0056-25 and Hollywood Self Storage FIELD ERECTION
- ▶Special inspection reports for FIELD operations
- ▶Completion certificates or status documentation
- +1 more items...
Seismic FIELD ERECTION Project: SWI-0056-25 - 957 Hartzell St
- ▶Contract award date
- ▶Completion date or % complete
- ▶Tonnage erected/scope
- +2 more items...
Seismic FIELD ERECTION Project: Hollywood Self Storage
- ▶Contract award date
- ▶Completion date or % complete
- ▶Tonnage erected/scope
- +2 more items...
FIELD Welding Procedures and FIELD Welder Qualification Manual
- ▶Executive signatures from Nate Swink and Ernesto Diaz for WPS approval
FIELD Welding Procedures QC Report
- ▶QC Inspector (Ernesto Diaz) final review and signature on compliance report
Health and Safety Manual - FIELD OPERATIONS
- ▶Update emergency contact numbers for all field sites
- ▶Add field superintendent contact information for each active project
- ▶Final approval signature from Nate Swink and Safety Manager
FIELD Quality Control Procedures
- ▶Add explicit field NCR (Non-Conformance Report) numbering system and tracking procedure
- ▶Include field CAR (Corrective Action Request) form references and process flow
- ▶Update field inspection frequency requirements per AISC 207-23
- +2 more items...
New FIELD Employee Orientation Plan
- ▶Add training competency verification checklist and sign-off procedure for new field hires
✍️ Documents Awaiting Signatures
Download, sign, and replace with completed versions
AISC Quality Manual
📋 10 signature lines • Pages 1-3
Need: Nate Swink, Ernesto Diaz, Eddie Medina
Welding Procedures Manual
📋 2 executive signatures • WPS approval
Need: Nate Swink, Ernesto Diaz
💡 How to Sign:
- 1.Click "Open" to download document
- 2.Print and sign physically, OR use digital signature tool
- 3.Scan signed document or save digital version
- 4.Replace original file with signed version
Total Documents
20
Required
12
Seismic Relevant
14
Last Updated
Jan 21, 2026
Documents by Category
AISC Submission Readiness: 0%
Some documents need additional information before AISC submission.
Certification Standard
AISC 207-25
Seismic Endorsement
⚠ Needs Info
📊 Submission Stats
🎯 Submission Goal
Target deadline: April 1, 2026
• Complete all required documents
• Resolve all information gaps
• Obtain necessary signatures
• Submit to AISC for review
🎯 AISC Submission Checklist
Track progress toward April 2026 submission deadline
🟢 100% Ready
0No documents ready yet
🟠 In Progress
9Organizational Chart - AISC CSE
AISC Certified Steel Erector Quality Manual
Quality Policy - AISC CSE
FIELD Quality Forms Package (F-001 through F-012)
FIELD Welding Procedures and FIELD Welder Qualification Manual
FIELD Welding Procedures QC Report
Health and Safety Manual - FIELD OPERATIONS
FIELD Quality Control Procedures
New FIELD Employee Orientation Plan
⚪ Not Started
3Personnel Qualification Documentation Package
Seismic Endorsement Documentation Package - FIELD ERECTION
Blocked by: Personnel Qualification Documentation Package